Monday, August 10, 2009

Engineering Resume

Derek Paulo
EDUCATION
California Polytechnic State University, San Luis Obispo                                                        
Degree in: Industrial Engineering
Senior Project: Investigation of Product Expansion
TECHNICAL SKILLS
PC/Mac Platforms, AutoCAD 2000/LT, Visio, IQMS, HTML, GUI design, Web site design, FTP, Flash 4, Photoshop, Illustrator, Acrobat, Frontpage, Dreamweaver, MS/Mozilla Browsers, Office, Windows, Pro Engineer R20, Minitab, Kaizen (Continuous Improvement), 5S, 6-sigma, Danaher Business System, Touchscreens
RELEVANT WORK EXPERIENCE
Opheilo Inc. (as a 1099 Contractor) - Escondido, California
West Coast Sales Consultant & Engineer - March 2007 to Present
- Sales and installation of Recycling Industry Software and hardware (IP cameras, scales, kiosks, etc)
- Wrote 115 Page Full-Color Software User Manual with illustrations and pictures
- Developed Customized Touchscreen Keyboard Interfaces for Clients
- Enhanced companies’ image and web presence through advertising campaigns (email, magazine, brochures and mailers)
- Consultant on facility layouts for workflow, parking, etc…
- Trained management and workers in state compliance laws and how to use the software to stay in compliance
Dpaulo Design - San Luis Obispo and Riverside, California
Web Designer/WebMaster - June 1999 to Present
- Web design/maintenance of sites including www.solanatan.com, www.tgatour.org, www.bryanknewman.com, www.buybackpro.com,  www.bbcnola.com,  www.impacttrainingsystems.com, www.helpusinternational.org, and others
- Shopping Cart design, Flash, Photoshop, logo creation, ftp, forms, etc. Print design in brochures, flyers, etc.
K&N Engineering - Riverside, California
Industrial Engineer - March 2005 to March 2007
- Designed a 26,000sf consolidated packaging area with 10 departments using conveyors to both process parts and deliver finished goods to the picking module/warehouse
- Project Manager for Packaging Area.  Work closely with Packaging/Plant Managers on all packaging issues
- Project Manager for several facility moves during the conveyor/mezzanine/warehousing install.  Project Manager for final Operations move.  Includes design, and management of electrical and plumbing contractors, IT and maintenance tasks.
- Designed a HVAC solution to cool and circulate a 270,000sf facility with an air exchange of 6/hr.  Collected and analyzed data, researched equipment and companies
- Continuous improvement throughout the facility.  Cost savings through automation equipment and optimization
PreProduction Plastics, Inc. - Corona, California
Manufacturing Engineer - April 2002 to September 2003
- Plastic Injection/Structural Foam/Gas-Assist Molding for medical, agricultural, computer industries
- Responsible for RMA’s and root cause analysis of non-conformance parts
- Create detailed Process Plans / Manufacturing Instruction Sheets
- Developed thorough spreadsheet to cost company’s entire product line to determine profitability in order for management to make fact-based, intelligent business decisions
- Meet with and discuss cost savings ideas with key personnel in customers’ organizations in order to develop the most mutually beneficial pricing
- Oversee and optimize all Manufacturing Processes: Molding, Secondary Operations, Paint, Assembly, Warehousing, etc
- Determine accurate material allocation and update information accordingly in BOM's
- Create highly detailed Job Production folders to ensure reproducibility of processes
- Create worker friendly, ergonomic work cells to minimize excessive labor
- Assist with the redesign of the company’s web site, preparation for ISO-9001-2000
Joslyn Sunbank Corporation, LLC - Paso Robles, California
Manufacturing Engineer, Associate (Internship) - September 1997 to March 1998
- Tool Crib Team Supervisor responsible for kitted tooling to entire production floor
- Facilitator for “Locked Turret Kaizens.”  Scheduled meetings, assigned tasks to team members and prepared written, oral and e-mail reports to upper management
- Served as technical support to assembly area and the Start Department
- Responsible for the implementation and education of workers in Danaher Business System principles including cellular manufacturing, work study, one-piece flow production and Kaizens
- Developed database using Microsoft Access for tracking and reordering of shop tooling.  Training of tool crib team members to maintain and use program
- Collect and analyze production data

No comments:

Post a Comment

Categories

audio (1) blog (4) church (2) constant contact (4) contact (1) css (6) design (14) e-store (7) engineering (1) excel (1) logo design (8) magazine ads (2) music (2) page layout (6) photography (4) print (13) SEO (8) twitter (2) video (5) web design (15) worship (2)

About This Blog

Primarily intended to show my ongoing design work... Thanks for stopping by.

Search This Blog

  © Blogger template 'Photoblog' by Ourblogtemplates.com 2008 | Sorpotel Recipe

Back to TOP